Three Roof Bids, Three Different Roofs. Here’s How to Tell.

Homeowner learning how to compare roofing estimates by reading three contractor bids side by side
Science Fair Edition · The Roof Quote Experiment

Question: Are these three bids for the same roof?

Hypothesis

To compare roofing estimates fairly, you have to line them up item by item, because the total at the bottom only means something when every bid describes the same roof.

Most homeowners glance at three totals and pick the middle one. But one bid may include a full tear-off, new flashing and a leak barrier, while another quietly leaves them out. That number isn’t cheaper. It’s smaller.

Method
Homeowner learning how to compare roofing estimates by reading three contractor bids side by side
Fig. 1 · Three bids, one roof to compare

To compare roofing estimates like a lab test, measure the roof the same way, check seven line items, then read the fine print.

Results
The 30-second version

To compare roofing estimates, match squares, tear-off, deck wood, leak barrier, flashing, ventilation and warranty first. A missing line is a question, not a discount.

9Minute
read

Read time · 9 minutes. Then test your own bids in the Line-Item Matcher.

Pinned to the board

What’s In This Guide

  1. Card 01Estimate vs. InspectionTwo different experiments.
  2. Card 02Measure the Same RoofSquares and waste factor.
  3. Card 03The Line-Item MatcherCompare roofing estimates in seven rows.
  4. Card 04Seven Trials, ExplainedWhat each line really covers.
  5. Card 05The Fine PrintPermits, cleanup, payment.
  6. Card 06Insurance-Claim EstimatesReading the adjuster’s sheet.
Card 01 · Control group

Estimate vs. Inspection: Two Different Experiments

Before you compare roofing estimates, know which document you’re holding. An inspection describes the roof you have. An estimate proposes the roof you’ll get. Don’t mistake one for the other.

IThe inspection: observation

  • Records condition, layer count and attic moisture.
  • Answers: “Does this roof need work, and why?”

EThe estimate: proposal

  • Lists the scope: what comes off, what goes on, in what amounts.
  • Names products, accessories and warranty.
  • Answers: “What exactly will you build, and for how much?”

A good estimate is built on a good inspection. If nobody checked the attic, you can’t compare roofing estimates fairly.

Card 02 · Calibrate the instruments

Measure the Same Roof Before You Compare

Roofers price by the square. GAF explains that one square equals 100 square feet, and suggests adding up to 10% overage for errors and installation. That overage is the waste factor.

Here’s why it matters when you compare roofing estimates: if one bid lists 28 squares and another lists 33, they may simply be measuring differently, or one may carry a bigger waste allowance. Valleys, hips and dormers add waste.

Ask each contractor for measured area and waste percentage as separate numbers, and whether they measured by hand or with an aerial report.

Contractor and homeowner who compare roofing estimates by checking roof squares and waste factor
Fig. 2 · Measure first, then compare roofing estimates
100square feet in one roofing square
≤10%overage GAF suggests planning for errors and installation
2numbers to request before you compare roofing estimates: area and waste
Card 03 · The signature experiment

Compare Roofing Estimates Line by Line

Three sample bids for one house (illustrations, not real contractors). Pick a line item to light it up across all three and see what to ask.

Bid AItemized
  1. 28 measured + 10% waste, shown separately
  2. All layers to the deck (2 found)
  3. 3 sheets included; extra billed per sheet
  4. Eaves and valleys, 24″ past wall line
  5. New step flashing and drip edge
  6. Ridge vent; intake checked
  7. System warranty + written workmanship term
Bid BPartial
  1. 31 squares (no measurement shown)
  2. Remove 1 layer
  3. “As needed”
  4. Eaves only
  5. Reuse existing
  6. Ridge vent
  7. Manufacturer standard
Bid COne line
  1. “Roof: 1 lot”
  2. Not listed
  3. Not listed
  4. Not listed
  5. “As needed”
  6. Not listed
  7. “Lifetime guarantee”

Line 1 · Squares

What to ask

“What’s the measured area, and what waste percentage did you add?”

Missing = red flag

A lump-sum “1 lot” hides the quantity entirely.

Line 2 · Tear-off

What to ask

“How many layers are on my roof now, and does your price remove all of them down to the deck?”

Missing = red flag

No tear-off line can mean a layover. On a roof that already has two layers, Ohio code doesn’t allow one.

Line 3 · Deck wood

What to ask

“How many sheets are included, and what’s the per-sheet price for anything beyond that?”

Missing = red flag

“As needed” with no rate is a blank check you sign before anyone sees the wood.

Line 4 · Leak barrier

What to ask

“Where does leak barrier go: eaves, valleys, chimneys, walls?”

Missing = red flag

Eaves and valleys collect ice and water. Skipping them is cheaper for a reason.

Line 5 · Flashing

What to ask

“Which flashing is new, which is reused, and who decides if old metal is still sound?”

Missing = red flag

Reused, rusted flashing at a chimney or wall is a leak waiting for spring.

Line 6 · Ventilation

What to ask

“What intake and exhaust will my attic have?”

Missing = red flag

Poor airflow traps heat and moisture in the attic and can shorten shingle life.

Line 7 · Warranty

What to ask

“Which manufacturer warranty gets registered, and how long is your workmanship warranty, in writing?”

Missing = red flag

A “lifetime guarantee” with no document protects nobody once the crew drives away.

Tap a line item to compare roofing estimates row by row. On a phone, each bid shows only that line.
Card 04 · Lab notebook

Seven Trials Every Bid Should Pass

These are the seven rows the matcher tests. Use them as your checklist whenever you compare roofing estimates.

  1. Squares and waste

    Same roof, same measurement method, waste shown as its own number. If quantities differ, ask why before you compare roofing estimates on price.

  2. Tear-off layers

    Ohio’s residential code, Ohio Admin. Code 4101:8-9-01, says a roof recover isn’t permitted where the existing roof has two or more applications of any roof covering, or where it’s water soaked or deteriorated. A replacement means removing coverings down to the deck.

  3. Deck replacement allowance

    Nobody sees every sheet of decking until the old roof comes off. A clear bid includes a set number of sheets plus a per-sheet price beyond that.

  4. Underlayment and leak barrier

    Where ice dams are a known risk, the same Ohio code calls for an ice barrier from the lowest roof edge to at least 24 inches inside the exterior wall line. Check that each bid names the underlayment and lists where leak barrier goes.

  5. Flashing: new or reused

    On a reroof, Ohio code requires existing flashings, edgings and vents to be replaced where rusted, damaged or deteriorated. A bid that says “reuse” should explain who decides. Our guide to roofing system components shows where each piece sits.

  6. Attic ventilation

    A roof breathes through intake at the eaves and exhaust near the ridge. A bid should say what’s being installed, not just “vents.”

  7. Shingle line, accessories and warranty

    Look for brand, line and color, plus starter strip, hip and ridge cap and other accessories. Manufacturer system warranties often depend on using qualifying components, so read our GAF roof warranty guide, then ask for the workmanship warranty term in writing.

Card 05 · Controls and variables

The Fine Print Under the Total

Permits. When you compare roofing estimates, check who pulls the permit. The Ohio Attorney General recommends a contract that requires the contractor to obtain all necessary permits and inspections.

Cleanup. Look for haul-away, landscape protection and a magnetic nail sweep.

Payment schedule. The same Ohio AG guidance warns against a large down payment or payment in full before the job is complete and inspected, and suggests at least three written estimates. The FTC adds: don’t automatically choose the lowest bidder, and ask for an explanation when estimates differ widely. Financing? See our home improvement loans guide before you sign.

Roofing contractor truck leaving a job, a reminder to get the workmanship warranty in writing
Fig. 3 · A warranty should outlast the truck
  • A one-line bid. You can’t compare roofing estimates when one says only “replace roof.”
  • Cash only or everything up front. The FTC flags both as warning signs.
  • No written right to cancel. If you sign at home, the FTC says the contract should state your three-business-day right to cancel.
  • Blank spaces. Every line filled in, every verbal promise written down.

Still choosing who to invite to bid? Start with our guide on how to pick a contractor.

Card 06 · A different data set

When the Estimate Comes From the Insurer

Homeowner comparing an insurance adjuster's line-item roof estimate with a contractor bid
Fig. 4 · Compare roofing estimates from adjuster and roofer

After a storm, you may hold an adjuster’s estimate built in estimating software, and you’ll need to compare roofing estimates in two formats. Each line has a description, quantity, unit and price, with separate lines for tear-off, underlayment, drip edge, ridge cap and permits.

You’ll often see replacement cost and actual cash value, with depreciation between them; your policy decides how that’s paid.

Set the adjuster’s lines beside your contractor’s and look for scope gaps, like a missing leak barrier or fewer squares. Ohio’s AG advises that any insurance payment details, including what happens if insurance doesn’t pay, be spelled out in writing.

Judging sheet

Your Sheet to Compare Roofing Estimates

Copy this onto a notepad and check each column. The bid with the most checks, not the lowest number, deserves the closest look.

Line itemWhat you should see in writingBid ABid BBid C
SquaresMeasured area + waste %☐☐☐
Tear-offLayer count, removed to deck☐☐☐
Deck woodSheets included + per-sheet rate☐☐☐
Leak barrierLocations named☐☐☐
FlashingNew vs. reused, by location☐☐☐
VentilationIntake and exhaust plan☐☐☐
WarrantyManufacturer + workmanship terms☐☐☐
Fine printPermits, cleanup, payment schedule☐☐☐
1stPlace

The Takeaway Worth Sharing

The lowest total only wins if it describes the same roof. Match the lines first, then compare the price.

Send this to a neighbor about to compare roofing estimates.

Get it done locally

Want a Bid That Shows Every Line?

Thrush & Son®: family-owned roofing and exterior pros since 1960.

If you’re in the Miami Valley and want to compare roofing estimates with one that spells out every line item, read the Thrush & Son® guide to roofing estimates, then book a visit.

➡️ Schedule in Dayton➡️ View All Services

Call (937) 833-5136 · 115 Jefferson St, Brookville, OH 45309

  • GAF President’s Club Contractor
  • Best of Dayton 2024 Winner · 2025 and 2026 Finalist
  • BBB Accredited A+
  • Since 1960
Keep going

Further Reading

Official sources: Ohio Admin. Code 4101:8-9-01 (Cornell LII), the Ohio Attorney General, the Federal Trade Commission and GAF.

Stay in touch

Stay Connected with the Thrush & Son® Family

Questions from the judges

Roof Estimate FAQ

How do I compare roofing estimates from different contractors?

Line them up item by item: squares and waste, tear-off, deck wood, leak barrier, flashing, ventilation and warranty. Then check permits, cleanup and payment terms before you compare totals.

How are roofing estimates different from inspections?

An inspection records the condition of the roof you have. An estimate proposes the scope, products, price and schedule for the roof you will get.

Can new shingles go over my old roof in Ohio?

Not if the existing roof already has two or more layers, or is water soaked or deteriorated. Ohio Admin. Code 4101:8-9-01 does not permit a roof recover in those cases.

What should a roof estimate say about deck wood?

It should list how many sheets of decking are included and the price per sheet for any extra.

How much should I pay before the roof is done?

The Ohio Attorney General advises against a large down payment or paying in full before the job is complete and inspected.

Written by Corey Thrush, Vice President and third generation of Thrush & Son®.